ビジネスとエンタープライズの中でのシステムズエンジニアリング能力の開発

Developing Systems Engineering Capabilities within Businesses and Enterprises

表示:

The pursuit of continuous improvement is a constant for many organizations. The description of Toyota (Morgan and Liker 2006), the Lean principle of “pursue perfection” (Oppenheim et al. 2010), and the principle of “don’t let up” (Kotter 1995), all drive a need for continuous improvement.

多くの組織にとって、継続的改善の追求は変わることのない営みである。Toyota に関する記述(Morgan and Liker 2006)、「完璧を追求する」というリーンの原則(Oppenheim et al. 2010)、「手を緩めるな」という原則(Kotter 1995)は、いずれも継続的改善の必要性を生み出している。

The ability to manage teams through their lifecycle – mobilize teams rapidly, establish and tailor an appropriate set of processes, metrics and systems engineering plans, support them to maintain a high level of performance, capitalize acquired knowledge and redeploy team members expeditiously as the team winds down – is a key organizational competence that has substantial leverage on project and organizational efficiency and effectiveness.

チームをそのライフサイクルを通じて管理する能力 — チームを迅速に動員し、適切な一連のプロセス、尺度、システムズエンジニアリング(systems engineering)計画を確立してテーラリングし、チームが高い水準のパフォーマンスを維持できるよう支援し、獲得した知識を資産として活用し、チームが解散するにつれてチームメンバーを迅速に再配置すること — は、プロジェクトと組織の効率と有効性に大きな影響力を持つ、主要な組織力量である。

The enterprise provides teams with the necessary resources, background information, facilities, cash, support services, tooling, etc. It also provides a physical, cultural and governance environment in which the teams can be effective. The key functions of the enterprise include generating and maintaining relevant resources, allocating them to teams, providing support and governance functions, maintaining expertise and knowledge (on process, application domain and solution technologies), securing the work that teams perform, organizing finance, and maintaining the viability of the enterprise.

エンタープライズは、チームに必要な資源、背景情報、施設、資金、支援サービス、ツールなどを提供する。また、チームが効果を発揮できる物理的、文化的(cultural)、ガバナンス(governance)的な環境も提供する。エンタープライズの主要な機能には、関連する資源を生み出して維持すること、それらをチームに配分すること、支援機能とガバナンス機能を提供すること、(プロセス、応用領域、ソリューション技術に関する)専門技能と知識を維持すること、チームが実施する仕事を確保すること、財務を整えること、エンタープライズの存続可能性を維持することが含まれる。

For improvements to persist, they must reside in the enterprise rather than just the individuals, so the improvements can endure as personnel leave. This is reflected in the Capability Maturity Model Integrated (CMMI) (SEI 2010) progression from a "hero culture" to a "quantitatively managed and optimizing process".

改善を持続させるには、改善が個人の中だけでなくエンタープライズの中に根付いていなければならない。そうすれば、人員が去っても改善は存続できる。このことは、能力成熟度モデル統合(CMMI)(SEI 2010)における「英雄文化」から「定量的に管理され最適化するプロセス」への進展に反映されている。

This topic outlines the issues to be considered in capability development and organizational learning.

このトピックでは、能力開発と組織学習において考慮すべき問題を概説する。

Overview

概要

Figure 1 shows an "analyze – organize – perform – assess – develop" cycle, which is essentially a reformulation of the Deming (1994) PDCA (Plan Do Check Act) cycle. The analysis step should cover both current and future needs, as far as these can be determined or predicted. Goals and performance assessment, as discussed in Assessing Systems Engineering Performance of Business and Enterprises, can be based on a number of evaluation frameworks, such as direct measures of business performance and effectiveness and the CMMI capability maturity models. There is evidence that many organizations find a positive correlation between business performance and CMMI levels (SEI 2010). This is discussed further in the Economic Value of Systems Engineering.

図1は「分析 — 組織化 — 実施 — 評価 — 開発」のサイクルを示している。これは本質的に、Deming(1994)の PDCA(計画・実施・確認・改善)サイクルを再定式化したものである。分析のステップでは、判断または予測できる範囲で、現在のニーズと将来のニーズの双方を扱うべきである。Assessing Systems Engineering Performance of Business and Enterprises で論じるように、目標を設定し、パフォーマンスを評価する際には、ビジネスのパフォーマンスと有効性を直接表す測定量や CMMI の能力成熟度モデルなど、さまざまな評価の枠組みに基づいて行うことができる。多くの組織がビジネスのパフォーマンスと CMMI のレベルの間に正の相関を見いだしているという証拠がある(SEI 2010)。この点については Economic Value of Systems Engineering でさらに論じる。

図1. ビジネスとエンタープライズのトピックのコンセプトマップ。(SEBoK Original)
Figure 1. Concept Map for Businesses and Enterprises Topics. (SEBoK Original)
図1. ビジネスとエンタープライズのトピックのコンセプトマップ。(SEBoK Original)

図中の英語

Strategy
戦略
implements
実装する
Governance
ガバナンス
includes
含む
SE Governance
SE ガバナンス
Set by (at level above)
(上のレベルによって)設定される
Sets (at level below)
(下のレベルを)設定する
Context
文脈
Scope
範囲
Purpose
目的
responsibilities
責任
accountabilities
説明責任
directs
指揮する
adjust
調整する
1. Analyse needs: Identify required capabilities of organisation
1. ニーズを分析する:組織の必要な能力を特定する
4. Develop business/ enterprise capability
4. ビジネス/エンタープライズの能力を開発する
resources and services
資源とサービス
individuals
個人
2. Organise to perform
2. 実施のために組織化する
develop/ redeploy/ get new
開発する/再配置する/新規に獲得する
3. Assess performance; determine gap vs needs
3. パフォーマンスを評価する。ニーズに対するギャップを決定する
measurement
測定
informs
情報を提供する
5. Culture
5. 文化
improve
改善する
Perform Systems Engineering
システムズエンジニアリングを実施する
Value
価値
Measured by
〜によって測定される

Change Levers

変更レバー

SE managers have a number of possible change levers they can use to develop SE capabilities. The amount of time delay between moving a lever and seeing the effect varies with the type of level, size of the enterprise, culture of the enterprise, and other factors.

SE のマネージャーが SE の能力を開発するために用い得る変更レバーは数多くある。レバーを動かしてから効果が現れるまでの時間差は、レバーの種類、エンタープライズの規模、エンタープライズの文化、その他の要因によって異なる。

Adjust Context, Scope, Purpose, Responsibility, Accountability Business Enterprise

文脈、範囲、目的、責任、説明責任を調整する — ビジネス/エンタープライズ

If the other change levers cannot achieve the desired effect, the business or enterprise may have to renegotiate its contribution to the higher-level strategy and mission.

他の変更レバーで望ましい効果が得られない場合、ビジネスやエンタープライズは、上位の戦略とミッションに対する自らの貢献を再交渉しなければならないことがある。

Review and Adjust Required Capabilities

必要な能力を見直し調整する

In the initial analysis the needed capability may have been over- or under-estimated. The need should be re-evaluated after each rotation of the cycle to make sure the planning assumptions are still valid.

初期の分析では、必要な能力を過大または過小に見積もっていた可能性がある。計画の前提が依然として妥当であることを確かめるため、サイクルが一巡するたびに必要性を再評価すべきである。

Adjust Organization within Business Enterprise

ビジネス/エンタープライズ内の組織を調整する

Adjusting organization and responsibilities so that "the right people are doing the right things", and ensuring that the organization is making full use of their knowledge and skills, is often the easiest change to make (and the one that may have the quickest effect).

「適切な人々が適切な事柄を行っている」状態になるよう組織と責任を調整し、組織が彼らの知識とスキルを最大限に活用していることを確実にすることは、多くの場合、最も実施しやすい変更である(そして、最も早く効果が現れ得る変更でもある)。

A potential risk is that too much organizational churn disrupts relationships and can destabilize the organization and damage performance. Process improvement can be set back by an ill-considered re-organization and can jeopardize any certifications the organization has earned which demonstrate its process capability or performance.

潜在的なリスクは、組織の変動が多すぎると関係が混乱し、組織を不安定にし、パフォーマンスを損なうことである。思慮に欠けた再組織化によってプロセス改善が後退することがあり、組織が取得した、プロセス能力やパフォーマンスを示す認証が危うくなることもある。

Develop/Train/Redeploy/Get New Resources, Services and Individuals

資源、サービス、個人を開発/訓練/再配置/新規に獲得する

Resources, services and individuals may include any of the components of organizational SE capability listed in Organizing Business and Enterprises to Perform Systems Engineering.

資源、サービス、個人には、Organizing Business and Enterprises to Perform Systems Engineering で列挙した組織の SE 能力の構成要素のいずれもが含まれ得る。

Levers include subcontracting elements of the work, improving information flows, upgrading facilities, and launching short-term training and/or long-term staff development programs. Many organizations consider how they approach these improvements to be proprietary, but organizations such as NASA offer insight on their APPEL website (NASA 2012).

レバーには、作業要素の下請け化、情報の流れの改善、施設のアップグレード、短期の訓練プログラムおよび/または長期のスタッフ育成プログラムの開始が含まれる。多くの組織は、こうした改善への取り組み方を専有情報と見なしているが、NASA などの組織は自らの APPEL ウェブサイトで知見を提供している(NASA 2012)。

Development of individuals is discussed in Enabling Individuals.

個人の育成については Enabling Individuals で論じる。

Improve Culture

文化を改善する

Culture change is very important and powerful but needs to be handled as a long-term game and given long term commitment.

文化(Culture)の変更は非常に重要かつ強力であるが、長期戦として取り組み、長期的にコミットする必要がある。

Adjust and Improve Alignment of Measures and Metrics

測定量と指標の整合を調整し改善する

Measurement drives behavior. Improving alignment of goals and incentives of different parts of the business/enterprise so that everyone works to a common purpose can be a very effective and powerful way of improving business/enterprise performance. This alignment does require some top-down guidance, perhaps a top-down holistic approach, considering the business/enterprise as a system with a clear understanding of how the elements of enterprise capability interact to produce synergistic value (See Assessing Systems Engineering Performance of Business and Enterprises). It is commonly reported that as an organization improves its processes with respect to the CMMI, its approach to metrics and measurement has to evolve.

測定(measurement)は振る舞いを左右する。全員が共通の目的に向かって働くよう、ビジネス/エンタープライズの各部分の目標とインセンティブの整合を高めることは、ビジネス/エンタープライズのパフォーマンスを改善する非常に効果的で強力な方法となり得る。この整合には、何らかのトップダウンの指針、おそらくはトップダウンの全体的なアプローチが必要であり、その際にはビジネス/エンタープライズを一つのシステムと見なし、エンタープライズ能力の要素がどのように相互作用して相乗的な価値を生み出すかを明確に理解する(Assessing Systems Engineering Performance of Business and Enterprises を参照)。組織が CMMI に照らして自らのプロセスを改善していくにつれて、尺度と測定へのアプローチも進化しなければならないことが一般に報告されている。

Change Methods

変更の方法

Doing Everyday Things Better

日々の事柄をより良く行う

There is a wealth of sources and techniques, including Kaizen, Deming PDCA (Deming 1994), Lean (Womack and Jones 2003, Oppenheim et al. 2010), Six-Sigma (Harry 1997), and CMMI.

カイゼン、Deming の PDCA(Deming 1994)、リーン(Womack and Jones 2003, Oppenheim et al. 2010)、Six-Sigma(Harry 1997)、CMMI など、豊富な情報源と技法がある。

Value stream mapping is a powerful Lean technique to find ways to improve flow and handovers at interfaces.

バリューストリームマッピングは、インタフェースにおける流れと引き継ぎを改善する方法を見いだすための、強力なリーンの技法である。

Managing Technology Readiness

技術の準備を管理する

In high-technology industries many problems are caused by attempting to transition new technologies into products and systems before the technology is mature; to make insufficient allowance for the effort required to make the step from technology demonstration to reproducible and dependable performance in a product; or to overestimate the re-usability of an existing product. NASA's TRL (Technology Readiness Level) construct, first proposed by John Mankins in 1995 (Mankins 1995), is widely and successfully used to understand and mitigate technology transition risk. Several organizations beyond NASA, such as the U.S. Department of Defense, even have automation to aid engineers in evaluating technology readiness.

ハイテク産業では、多くの問題が次のような原因で生じる。すなわち、技術が成熟する前に新しい技術を製品やシステムへ移行させようとすること、技術の実証から製品における再現性と信頼性のあるパフォーマンスへと進むのに必要な労力を十分に見込まないこと、あるいは既存製品の再利用可能性を過大評価することである。NASA の TRL(技術準備レベル)という概念は、1995年に John Mankins によって初めて提案されたもので(Mankins 1995)、技術移行のリスクを理解し軽減するために広く、かつ成功裏に用いられている。米国国防総省など、NASA 以外のいくつかの組織は、エンジニアによる技術の準備の評価を支援する自動化の仕組みさえ備えている。

Variations on TRL have emerged, such as System Readiness Levels (SRL) (Sauser et al. 2006), which recognize that the ability to successfully deliver systems depends on much more than the maturity of the technology base used to create those systems; e.g., there could be surprising risks associated with using two technologies that are relatively mature in isolation, but have never been integrated together before.

TRL のバリエーションも登場しており、例えばシステム準備レベル(SRL)(Sauser et al. 2006)がある。これは、システムをうまく提供できるかどうかは、技術基盤の成熟度に加え、それ以外の多くの要因にも左右されることを認識したものである。例えば、個々には比較的成熟しているものの、これまで統合されたことのない2つの技術を用いる場合には、思いがけないリスクが伴う可能性がある。

Planned Change: Standing Up or Formalizing SE in an Organization

計画された変更:組織で SE を立ち上げる、または正式な業務として確立する

Planned change may include: *introducing SE to a business (Farncombe and Woodcock 2009); *improvement/transformation; *formalizing the way a business or project does SE; *dealing with a merger/demerger/major re-organization; *developing a new generation or disruptive product, system, service or product line (Christensen 1997); *entering a new market; and *managing project lifecycle transitions: start-up, changing to the next phase of development, transition to manufacture/operation/support, wind down and decommissioning.

CMMI is widely used to provide a framework for planned change in a systems engineering context. Planned change needs to take a holistic approach considering people (knowledge, skills, culture, ability and motivation), process, measurement and tools as a coherent whole. It is now widely believed that tools and process are not a substitute for skills and experience. Instead, they merely provide a framework in which skilled and motivated people can be more effective. Therefore, change should start with people rather than with tools.

Before a change is started, it is advisable to baseline the current business performance and SE capability and establish metrics that will show early on whether the change is achieving the desired effect.

計画された変更には以下が含まれ得る:

CMMI は、システムズエンジニアリングの文脈で計画された変更を行うための枠組みとして広く用いられている。計画された変更では、人(知識、スキル、文化、能力、動機)、プロセス、測定、ツールを首尾一貫した全体として捉える全体的なアプローチを取る必要がある。今日では、ツールとプロセスはスキルと経験の代わりにはならないと広く考えられている。むしろ、それらは、熟練し意欲のある人々がより効果を発揮できる枠組みを提供するにすぎない。したがって、変更はツールではなく人から始めるべきである。

変更に着手する前に、現在のビジネスのパフォーマンスと SE 能力のベースラインを確立し、変更が望ましい効果を上げているかどうかを早い段階で示す尺度を設けておくことが推奨される。

Responding to Unforeseen Disruption

予期しない機能中断に対応する

Unforeseen disruptions may be internally or externally imposed. Externally imposed disruptions may be caused by: *the customer – win/lose contract, mandated teaming or redirection; *competitors – current offering becomes more/less competitive, a disruptive innovation may be launched in market; or *governance and regulatory changes – new processes, certification, safety or environmental standards.

Internal or self-induced disruptions may include: *a capability drop-out due to loss of people, facilities, financing; *product or service failure in operation or disposal; or *strategy change (e.g. new CEO, response to market dynamics, or a priority override).

機能中断は、内部から課される場合も外部から課される場合もある。外部から課される機能中断は、以下によって引き起こされ得る:

内部で生じる、あるいは自ら招く機能中断には、以下が含まれ得る:

Embedding Change

変更を組み込む

In an SE context, sustained effort is required to maintain improvements such as higher CMMI levels, Lean and Safety cultures, etc., once they are achieved. There are several useful change models, including Kotter’s 8 phases of change (Kotter 1995): #Establish a sense of urgency; #Create a coalition; #Develop a clear vision; #Share the vision; #Empower people to clear obstacles; #Secure short-term wins; #Consolidate and keep moving; and #Anchor the change.

The first six steps are the easy ones. The Chaos Model (Zuijderhoudt 1990; 2002) draws on complexity theory to show that regression is likely if the short-term wins are not consolidated, institutionalized and anchored. This explains the oft-seen phenomenon of organizations indulging in numerous change initiatives, none of which stick because attention moves on to the next before the previous one is anchored.

SE の文脈では、より高い CMMI のレベル、リーンと安全の文化(culture)など、達成した改善を維持するには持続的な努力が必要である。役立つ変更モデルはいくつかあり、その中には Kotter の変更の8フェーズ(Kotter 1995)も含まれる:

  1. 切迫感を醸成する
  2. 連合を形成する
  3. 明確なビジョンを策定する
  4. ビジョンを共有する
  5. 人々が障害を取り除けるよう権限を与える
  6. 短期的な成果を確保する
  7. 成果を固め、前進を続ける、そして
  8. 変更を定着させる

最初の6つのステップは容易な部分である。カオスモデル(Zuijderhoudt 1990; 2002)は複雑性理論に基づき、短期的な成果を固め、制度化し、定着させなければ、後退が起こりやすいことを示している。これにより、組織が数多くの変更イニシアチブに手を広げるものの、前のものが定着する前に関心が次のものへ移ってしまうため、どれも定着しないという、よく見られる現象が説明できる。

Change Management Literature

変更管理の文献

SE leaders (directors, functional managers, team leaders and specialists) have responsibilities, and control levers to implement them, that vary depending on their organization’s business model and structure. A great deal of their time and energy is spent managing change in pursuit of short-, medium- and long-term organizational goals: “doing everyday things better”; making change happen; embedding change and delivering the benefit; and coping with the effects of disruptions. Mergers, acquisitions and project start-ups, phase changes, transitions from “discovery” to “delivery” phase, transition to operation, sudden change in level of funding, can all impose abrupt changes on organizations that can destabilize teams, processes, culture and performance. Table 1 below provides both the general management literature and specific systems engineering knowledge.

SE のリーダー(ディレクター、機能マネージャー、チームリーダー、専門家)は、組織のビジネスモデルと構造に応じて異なる責任と、その責任を果たすために使える管理手段を持つ。彼らの時間とエネルギーの多くは、短期・中期・長期の組織目標を追求する中での変更の管理に費やされる。すなわち、「日々の事柄をより良く行う」こと、変更を起こすこと、変更を組み込んで恩恵をもたらすこと、機能中断の影響に対処することである。合併、買収、プロジェクトの立ち上げ、フェーズの変更、「発見」フェーズから「提供」フェーズへの移行、運用への移行、資金水準の急変はいずれも、チーム、プロセス、文化(culture)、パフォーマンスを不安定にしかねない急激な変更を組織に課すことがある。下の表1には、一般的な管理の文献と、システムズエンジニアリングに特有の知識の双方を示す。

表1. 変更管理 — ビジネスと SE の参考文献。(SEBoK Original)

+ Table 1. Change Management – Business and SE References. (SEBoK Original)
Area
Business references
SE references
Doing Every-day Things Better
Dealing with Unplanned Disruption
Driving Disruptive Innovation
Exploiting Unexpected Opportunities
Implementing and Embedding Planned Change
Understanding People’s Motivation, Behavior
Understanding Culture
Helping Individuals Cope with Change
領域ビジネスの参考文献SE の参考文献
日々の事柄をより良く行うKaizen; Lean (Womack and Jones 2003); 6-Sigma (Harry 1997)/Four Competencies of Learning Organisation – Absorb, Diffuse, Generate, Exploit (Sprenger and Ten Have 1996)/The Seven Habits of Very Effective People (Covey 1989)CMMI/Visualizing Project Management (Forsberg and Mooz 2005)/INCOSE IEWG "Conops for a Systems Engineering Educational Community" (Ring and Wymore 2004)/INCOSE Lean Enablers for SE (Oppenhein et al. 2010)
計画外の機能中断への対処Managing Crises Before They Happen (Mitroff and Anagnos 2005)/Scenarios: Uncharted Waters Ahead (Wack 1985)/Scenario Planning: Managing for the Future (Ringland 1988)Architecting Resilient Systems (Jackson 2010)/Design Principles for Ultra-Large-Scale Systems (Sillitto 2010)
破壊的革新の駆動The Innovator's Dilemma (Christensen 1997)/Rise and Fall of Strategic Planning, (Mintzberg 2000)/BS7000, Standard for Innovation Management (BSI 2008)
予期しない機会の活用Rise and Fall of Strategic Planning (Mintzberg 2000)/Mission Command (military), Auftragstechnik (Bungay 2002, 32)Architecting for Flexibility and Resilience (Jackson 2010)/Open System Architectures; Lean SE; (Oppenheim et al. 2010)/Agile Methodologies
計画された変更の実装と定着Kotter's Eight Phases of Change (Kotter 1995)/Berenschot's Seven Forces (ten Have et al. 2003)/Levers of Control (Simons 1995) – Tension between Control, Creativity, Initiative and Risk Taking/Chaos Model from "Complexity Theory Applied to Change Processes in Organisations"; (Zuiderhoudt and Ten Have 1999)/Business Process Re-engineering (Hammer and Champy 1993)/The 5th Discipline (Senge 2006)/Change Quadrants (Amsterdam 1999)Doing it differently - Systems for Rethinking Construction (Blockley and Godfrey 2000)/INCOSE UK Chapter Z-guides: Z-2, Introducing SE to an Organisation (Farncombe and Woodcock 2009); Z-7, Systems Thinking (Godfrey and Woodcock 2010)
人々の動機、振る舞いの理解Maslow's Hierarchy of Needs/Myers-Briggs Type Indicator/NLP (Neuro-Linguistic Programming) (See for example: Knight 2009)/Performance by Design: Sociotechnical Systems in North America (Taylor and Felten 1993)/Core Quadrants, (Offman 2001)INCOSE Intelligent Enterprise Working Group – "Enthusiasm", Stretch Goals (Ring and Wymore 2004)/Sociotechnical Systems Engineering, Responsibility Mapping, from "Deriving Information Requirements from Responsibility Models" (Sommerville et al. 2009)
文化の理解Cultural Dimensions, from "Culture's Consequences" (Hofstede 1994)/Compliance Typology, from "A Comparative Analysis of Complex Organizations" (Etzione 1961)
個人が変更に対処するのを助ける5 C's of Individual Change, and Rational/Emotional Axes, Kets De Vries, quoted in "Key Management Models" (Ten Have et al. 2003)Rational/Emotional, NLP and Other Methods, from "Relationships Made Easy" (Fraser 2010)

References

参考文献

Works Cited

引用文献

Blockley, D. and P. Godfrey. 2000. Doing It Differently – Systems for Rethinking Construction. London, UK: Thomas Telford, Ltd.

Bungay, S. 2002. Alamein. London, UK: Aurum press. First published 2002, Paperback 2003.

BSI. 2008. Design Management Systems. Guide to Managing Innovation. London, UK: British Standards Institution (BSI). BS 7000-1:2008.

Christensen, C. 1997. ''The Innovator's Dilemma: When New Technologies Cause Great Firms to Fail.'' Cambridge, MA, USA: Harvard Business School Press.

Christensen, C. 1997. The Innovator's Dilemma: When New Technologies Cause Great Firms to Fail. Cambridge, MA, USA: Harvard Business School Press.

Covey, S.R. 1989. The Seven Habits of Highly Effective People. Also released as a 15th Anniversary Edition (2004). New York, NY, USA: Simon & Schuster, 1989.

Deming, W.E. 1994. The New Economics. Cambridge, MA, USA: Massachusetts Institute of Technology, Centre for Advanced Educational Services.

Etzione, A. 1961. A Comparative Analysis of Complex Organizations. On Power, Involvement and their Correlates. New York, NY, USA: The Free Press of Glencoe, Inc.

Farncombe, A. and H. Woodcock. 2009. ‘’Enabling Systems Engineering.’’ Somerset, UK: INCOSE UK Chapter. Z-2 Guide, Issue 2.0 (March 2009). Accessed September 14, 2011. Available at https://www.incoseonline.org.uk/Documents/zGuides/Z2_Enabling_SE.pdf.

Forsberg, K. and H. Mooz. 2005. Visualizing Program Management, Models and Frameworks for Mastering Complex Systems, 3rd ed. New York, NY, USA: Wiley and Sons, Inc.

Fraser, D. 2010. Relationships Made Easy: How to Get on with The People You Need to Get on with...and Stay Friends with Everyone Else. Worcestershire, UK: HotHive Publishing.

Godfrey, P. and H. Woodcock. 2010. ‘’What is Systems Thinking?’’ Somerset, UK: INCOSE UK Chapter, Z-7 Guide, Issue 1.0 (March 2010). Accessed on September 7, 2011. Available at https://www.incoseonline.org.uk/Documents/zGuides/Z7_Systems_Thinking_WEB.pdf.

Hammer, M. and J.A. Champy. 1993. Reengineering the Corporation: A Manifesto for Business Revolution. New York, NY, USA: Harper Business Books.

Harry, M.J. 1997. The Nature of Six Sigma Quality. Schaumburg, IL, USA: Motorola University Press.

Hofstede, G. 1984. Culture’s Consequences: International Differences in Work-Related Values. Newbury Park, CA, USA and London, UK: Sage Publications Inc.

Jackson, S. 2010. Architecting Resilient Systems: Accident Avoidance and Survival and Recovery from Disruptions. A. P. Sage (ed.). Wiley Series in Systems Engineering and Management. New York, NY, USA: Wiley & Sons, Inc.

Knight, S. 2009. NLP at Work - Neuro Linguistic Programming The Essence of Excellence, 1st edition 1995. 3rd edition 2009. London, UK and Boston, MA, USA: Nicholas Brealey Publishing.

Kotter, J. 1995. ‘’Leading Change: Why Transformation Efforts Fail’’. “Harvard Business Review.” (March-April 1995).

Mintzberg, H. 2000. The Rise and Fall of Strategic Planning. Upper Saddle River, NJ, USA: Pearson Education.

Mitroff, I. and G. Anagnos. 2005.Managing Crises Before They Happen: What Every Executive and Manager Needs to Know about Crisis Management. New York, NY, USA: AMACOM Press.

Morgan, J. and J. Liker. 2006. The Toyota Product Development System: Integrating People, Process and Technology. New York, NY, USA: Productivity Press.

NASA. 2012. ‘’APPEL: Academy of Program/Project & Engineering Leadership.’’ Accessed on September 9, 2012. Available at https://www.nasa.gov/offices/oce/appel/seldp/nasa-se/index.html.

Offman, D.D. 2001. Inspiration and Quality in Organizations, (Original title (Dutch): Bezieling en Kwaliteit in Organisaties), 12th Edition. Utrecht, The Netherlands: Kosmos-Z&K.

Oppenheim, B., E. Murman, and D. Sekor. 2010. Lean Enablers for Systems Engineering. Systems Engineering. 14(1). New York, NY, USA: Wiley and Sons, Inc.

Ring, J. and A.W. Wymore (eds.) 2004. Concept of Operations (conops) of A Systems Engineering Education Community (SEEC). Seattle, WA, USA: INCOSE Education Measurement Working Group (EMWG), INCOSE-TP-2003-015-01.

Ringland, G. 1998. Scenario Planning: Managing for the Future. New York, NY, USA: Wiley and Sons, Inc.

Sauser, B., D. Verma, J. Ramirez-Marque and R. Gove 2006. ‘’From TRL to SRL: The Concept of System Readiness Levels.’’ Proceedings of the Conference on Systems Engineering Research (CSER), Los Angeles, CA.

SEI. 2010. Capability Maturity Model Integrated (CMMI) for Development, version 1.3. Pittsburgh, PA, USA: Software Engineering Institute (SEI)/Carnegie Mellon University (CMU).

Senge, P.M. 2006. The Fifth Discipline: The Art and Practice of the Learning Organization, 2nd ed. New York, NY, USA: Doubleday/Currency.

Simons, R. 1995. Levers of Control, How Managers Use Innovative Control Systems to Drive Strategic Renewal. Boston, MA, USA: Harvard Business School Press.

Sillitto, H. 2010. ‘’Design Principles for Ultra-Large-Scale Systems.’’ Paper in 20th Annual International Council on Systems Engineering (INCOSE) International Symposium. 12-15 July 2010. Chicago, IL, USA. (Reprinted in The Singapore Engineer, IES, April 2011).

Sommerville, I., R. Lock, T. Storer, and J.E. Dobson. 2009. ‘’Deriving Information Requirements from Responsibility Models. Paper in the 21st International Conference on Advanced Information Systems Engineering (CAiSE). June 2009. Amsterdam, Netherlands. p. 515-529.

Sommerville, I., R. Lock, T. Storer, and J.E. Dobson. 2009. ''Deriving Information Requirements from Responsibility Models''. Paper in the 21st International Conference on Advanced Information Systems Engineering (CAiSE). June 2009. Amsterdam, Netherlands. p. 515-529.''

Sprenger, C. and S. Ten Have. 1996. ‘’4 Competencies of a Learning Organisation.’’ (Original title (Dutch): Kennismanagement Als Moter van Delerende Organisatie), Holland Management Review, (Sept–Oct): 73–89.

Taylor, J.C. and D.F. Felten. 1993. Performance by Design: Sociotechnical Systems in North America. Englewood Cliffs, NJ, USA:Pearson Education Ltd. (Formerly Prentice Hall).

ten Have, S., W.T. Have, F. Stevens, and M. van der Elst. 2003. Key Management Models - The Management Tools and Practices That Will Improve Your Business. Upper Saddle River, NJ, USA: Pearson Education Ltd. (Formerly Prentice Hall).

Wack, P. 1985. ‘’Scenarios: Uncharted Waters Ahead.’’ “Harvard Business Review:. (September-October 1985).

Womack, J. and D. Jones. 2003. Lean Thinking: Banish Waste and Create Wealth in Your Corporation, Revised Edition. New York, NY, USA: Simon & Schuster.

Zuiderhoudt, W. and B. Ten Have. 1999. Complexity Theory Applied to Change Processes in Organisations.

Primary References

主要参考文献

Kotter, J. 1995. Leading Change: Why Transformation Efforts Fail. “Harvard Business Review.” (March-April 1995).

Oppenheim, B., E. Murman, and D. Sekor. 2010. Lean Enablers for Systems Engineering. “Systems Engineering.” 14(1). New York, NY, USA: Wiley and Sons, Inc.

SEI. 2010. Capability Maturity Model Integrated (CMMI) for Development, version 1.3. Pittsburgh, PA, USA: Software Engineering Institute (SEI)/Carnegie Mellon University (CMU).

Senge, P.M. 2006. The Fifth Discipline: The Art and Practice of the Learning Organization, 2nd ed. New York, NY, USA: Doubleday/Currency.

Additional References

追加参考文献

None.